Home > Term: schedule variance
schedule variance
The difference between the budgeted cost of work performed (BCWP) and the budgeted cost of work scheduled (BCWS). This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled.
- Besedna vrsta: noun
- Industrija/področje: Software
- Category: Operating systems
- Company: Microsoft
0
Avtor
- Maxiao
- 100% positive feedback