Home > Term: fixed date
fixed date
A date to which a task is tied either because the date was entered in the Actual Start or Actual Finish field or because the task is constrained by an inflexible constraint.
- Besedna vrsta: noun
- Industrija/področje: Software
- Category: Operating systems
- Company: Microsoft
0
Avtor
- Maxiao
- 100% positive feedback