budget at completion
The original project, resource, and assignment cost as shown in the baseline plan. The baseline cost is a snapshot of the cost at the time when the baseline plan was saved.
- Besedna vrsta: noun
- Industrija/področje: Software
- Category: Operating systems
- Company: Microsoft