Home > Term: baseline plan
baseline plan
The original project plans (up to 11 per project) used to track progress on a project. The baseline plan is a snapshot of your schedule at the time that you save the baseline and includes information about tasks, resources, and assignments.
- Besedna vrsta: noun
- Industrija/področje: Software
- Category: Operating systems
- Company: Microsoft
0
Avtor
- Maxiao
- 100% positive feedback