Home > Term: available but not needed capability
available but not needed capability
Net capability of main generating units that are operable but not considered necessary to carry load and cannot be connected to load within 30 minutes.
- Besedna vrsta: noun
- Industrija/področje: Energy
- Category: Coal; Natural gas; Petrol
- Company: EIA
0
Avtor
- Pud6
- 100% positive feedback