Home >  Term: kritická cesta
kritická cesta

The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project.

0 0

Avtor

  • Aptrans
  •  (Gold) 2912 points
  • 100% positive feedback
© 2026 CSOFT International, Ltd.